WAL752 is a gas-fired internal combustion power plant located in Pasadena, Texas, within the Texas Reliability Entity (NERC Region). The facility operates with a capacity of 1.2 megawatts and is integrated into the Electric Reliability Council of Texas (ERCOT) power control area. The plant is operated by Wal-Mart Stores Texas, which also serves as the majority owner. As an unregulated entity, WAL752 is part of Walmart’s broader energy strategy, leveraging natural gas as its primary fuel source to support operational efficiency and sustainability initiatives.