WAL2724 is an internal combustion power generation facility located in Pasadena, Texas, within the Texas Reliability Entity (NERC Region). The plant operates with a capacity of 1.2 megawatts and is integrated into the Electric Reliability Council of Texas (ERCOT) power control area. The facility is operated by Wal-Mart Stores Texas, which also serves as the majority owner. The plant is unregulated and utilizes gas as its primary fuel source. Walmart, the holding company, oversees the operations and management of this facility, ensuring compliance with industry standards and contributing to the energy needs of the region.