The McDougle-Mitchell Solar Project Hybrid C, located in Charlton, Massachusetts, operates within the Northeast Power Coordinating Council (NERC) region. This solar facility boasts an operating capacity of 4.5 megawatts and is integrated into the ISO New England power control area. The project is managed by AES Distributed Energy, which serves as both the plant operator and majority owner. The regulatory status of the facility is unregulated, and it is owned by The AES Corporation, a leading global energy company. Utilizing solar energy as its primary fuel source, the McDougle-Mitchell Solar Project Hybrid C exemplifies a commitment to sustainable energy solutions in the region.