The Hancock Creek Hydroelectric Project, located in Snoqualmie, Washington, operates under the jurisdiction of the Western Electricity Coordinating Council (NERC Region). This facility utilizes hydraulic turbine technology to generate an operating capacity of 7 megawatts (MW). The project is managed by Snohomish County Public Utility District No. 1, which serves as both the plant operator and majority owner. The power generated is integrated into the Puget Sound Energy control area, ensuring reliable energy distribution. As a regulated entity, the Hancock Creek Hydroelectric Project adheres to all applicable regulatory standards, utilizing water as its primary fuel source.