FELPS 2 – Calaveras is a solar power facility located in Floresville, Texas, within the Texas Reliability Entity (NERC Region). The plant operates with a capacity of 1 MW and is integrated into the Electric Reliability Council of Texas (ERCOT) power control area. The facility is managed by Dg Central 1 and operates under an unregulated status. The majority ownership is held by NextEra Energy Resources, a subsidiary of NextEra Energy, which is a leading company in the renewable energy sector. The plant utilizes solar energy as its primary fuel source, contributing to the growing demand for sustainable energy solutions in the region.