Co-Gen II is a biomass-fueled power generation facility located in Riddle, Oregon, operating under the jurisdiction of the Bonneville Power Administration within the Western Electricity Coordinating Council (WECC) region. The plant utilizes steam turbine technology to achieve an operating capacity of 7.8 megawatts (MW). As an unregulated facility, Co-Gen II is managed by Co-Generation Co, which also holds the majority ownership of the plant. This strategic positioning allows Co-Gen II to contribute to the renewable energy landscape while adhering to the operational standards set forth by its regulatory environment.