Blackwell’s Corner Storage Facility, located in Lost Hills, California, operates within the Western Electricity Coordinating Council (WECC) region. This facility utilizes advanced battery technology to provide an operating capacity of 2 megawatts (MW) and is integrated into the California Independent System Operator (CAISO) power control area. The facility is managed by Whitepine Renewables, which serves as both the majority owner and the holding company. As an unregulated entity, Blackwell’s Corner Storage Facility plays a crucial role in energy storage, contributing to the stability and reliability of the regional power grid.