Bellisario Solar 2 is a solar power facility located in Marathon, New York, within the Northeast Power Coordinating Council (NERC) region. The plant operates with a capacity of 5 megawatts (MW) and is integrated into the New York Independent System Operator’s power control area. Managed by Lapeer-Cortland Solar, Bellisario Solar 2 is classified as an unregulated facility. The majority ownership is held by NextEra Energy Resources, a subsidiary of NextEra Energy, which underscores the commitment to renewable energy solutions. The plant harnesses solar energy, contributing to sustainable power generation in the region.