Alticor Inc is engaged in a solar energy project located in Buena Park, California, within the Western Electricity Coordinating Council (WECC) region. The facility operates with a capacity of 1.1 megawatts, utilizing solar technology to harness energy from the sun. The project is managed by Solar Star California LXIV, which serves as both the plant operator and the majority owner. The power generated is integrated into the California Independent System Operator (CAISO) power control area. As an unregulated entity, Alticor Inc operates under a framework that allows for flexibility in its energy production and distribution strategies.