The 9521 US 14 Solar 1 facility, located in Harvard, Illinois, operates under the jurisdiction of the ReliabilityFirst Corporation within the PJM Interconnection power control area. This solar power plant boasts an operating capacity of 2 MW and is classified as unregulated. The facility is managed by Generate Capital PBC, which also serves as the majority owner and holding company. The primary fuel source for the plant is solar energy, contributing to sustainable power generation. Additionally, EcoPlexus is recognized as another owner of the power plant.