The proposed 470-mile-long Greenlink West transmission line from Las Vegas to Reno will cross the boundaries of a national monument established by Congress a decade ago to protect Ice Age fossils. The Bureau of Land Management (BLM) outlined a plan in its analysis of the project that includes special provisions designed to protect the paleontological resources along a 1.5-mile section of the line that will crossing the Tule Springs Fossil Beds National Monument near Las Vegas. The final environmental impact statement, which includes a “preferred alternative” routing the line about 5 feet inside the monument boundary, was released without mentioning the proposed route.

Solar Dominates US Energy Capacity Growth
The Federal Energy Regulatory Commission (FERC) has published data showing that solar accounted for over 75% of US electrical generating







