Whitegrass No 2 Geothermal is a geothermal energy project located in Yerington, Nevada, operated by Open Mountain Energy. With a capacity of 6 MW, this project utilizes geothermal technology as its primary fuel source. It is currently classified as unregulated under U.S. regulatory standards. The project is expected to come online in 2025 and will contribute to the power control area managed by Nevada Power Company. Open Mountain Energy serves as both the project operator and owner, ensuring a cohesive management structure for the development and operation of this renewable energy initiative.