Walnut Solar, operated by Origis Energy USA and owned by the same entity, is a significant photovoltaic project with a capacity of 200 MW. The project is situated within the Tennessee Valley Authority power control area and is expected to come online in 2025. As an unregulated facility, Walnut Solar leverages solar energy as its primary fuel source, contributing to the growing renewable energy landscape. The project is backed by Antin Infrastructure Partners SAS, ensuring robust financial and operational support.