Tyson Nick is a photovoltaic power project identified by EIA Plant Code 68856, operated and owned by AB CarVal Investors, with its holding company being Equitable Holdings. The project is situated within the ERCOT power control area and is expected to have a capacity of 114 MW, utilizing solar energy as its primary fuel source. The project is classified as unregulated under US regulatory status and is anticipated to come online in the year 2025. The geographical coordinates for the project are 33.64775 degrees latitude.