Tymochtee Solar is a significant photovoltaic solar energy project located in Sycamore, Ohio, with a capacity of 120 megawatts. Operated by Tymochtee Solar, the project is owned by TotalEnergies Renewables USA, a subsidiary of TotalEnergies SE. The facility operates within the PJM Interconnection power control area and utilizes solar energy as its primary fuel source. As an unregulated project, Tymochtee Solar is positioned to contribute to the growing renewable energy landscape, although its expected online year has not been specified.