Timber Road Energy Storage III is a state-of-the-art energy storage project located in Payne, Ohio, within the PJM Interconnection power control area. Operated by Timber Road III Storage and owned by EDP SA, this facility is designed to provide 50 megawatts (MW) of capacity utilizing advanced battery technology. As an unregulated project, Timber Road Energy Storage III is positioned to enhance grid reliability and support renewable energy integration. The project is expected to come online in 2029, contributing to the growing demand for efficient energy storage solutions in the region.