Sycamore Cross Solar is a photovoltaic solar energy project located in Ivor, Virginia, with a capacity of 240 megawatts (MW). Operated and owned by The AES Corporation, this project is positioned within the PJM Interconnection power control area. The facility is classified as unregulated under U.S. regulatory status, allowing for flexible operational strategies. The project is expected to come online in 2026, harnessing solar energy as its primary fuel source. With a geographic latitude of 37.01615 degrees, Sycamore Cross Solar represents a significant investment in renewable energy infrastructure, contributing to the transition towards sustainable power generation.