SR Bacon II is a photovoltaic power project operated by Green Power EMC, with an expected online year of 2027. The project, identified by EIA Plant Code 68553, has a capacity of 115 MW and utilizes solar energy as its primary fuel source. It is situated within the Southern Company power control area and is classified as unregulated under US regulatory status. Green Power EMC serves as both the project operator and owner, ensuring a cohesive management structure for the development and operation of this renewable energy initiative.