The Solar Carver 1 Hybrid project, identified by EIA Plant Code 63541, is a strategic initiative operated by PGR 2020 Lessee 7 and owned by Pine Gate Renewables. This project, located in Carver, Massachusetts, is set to leverage advanced battery technology for energy storage, with a total capacity of 2 MW. As an unregulated facility within the ISO New England power control area, Solar Carver 1 Hybrid is expected to come online in 2025, contributing to the region’s renewable energy landscape and enhancing energy reliability.