This website is under development, but we are pushing out updates as we build, so check back Nov. 1 for our official launch.

Smith Lake Solar is a significant photovoltaic solar energy project located in Anderson, Texas, within the ERCOT power control area. Operated and owned by Birch Creek Development, this unregulated facility is designed to have a capacity of 400 megawatts (MW), harnessing solar energy as its primary fuel source. The project is expected to come online in 2026, contributing to the growing demand for renewable energy solutions in the region. With its strategic location at a latitude of 30.60028 degrees, Smith Lake Solar represents a forward-thinking investment in sustainable energy infrastructure.

Loading...
Smith Lake Solar Smith Lake Solar DC
Photovoltaic
Birch Creek Development
Birch Creek Development
Unregulated
TRE
ERCOT
null
TX
United States
400
400
Early Development
null
null