Skylight Renewable Energy, identified by EIA Plant Code 68032, is a significant energy project located in Rio Oso, California. Operated by Vesper Energy Development and backed by Magnetar Capital Partners, this project is poised to contribute to the energy landscape with a capacity of 100 MW. Utilizing advanced energy storage technology, Skylight Renewable Energy is designed to enhance grid reliability and support renewable energy integration. The project is currently classified as unregulated under U.S. regulatory standards and is expected to come online in 2028. It operates within the California Independent System Operator power control area, positioning it strategically within a key market for renewable energy solutions.