The PP Jaguar SP Jaguar Solar project, operated by Perfect Power, is a significant photovoltaic solar energy initiative located in Waco, Texas, within the ERCOT power control area. With a projected capacity of 300 MW, this unregulated project is set to harness solar energy as its primary fuel source. The project is expected to come online in 2027, contributing to the growing demand for renewable energy solutions. Perfect Power serves as both the project operator and owner, ensuring a cohesive approach to the development and management of this solar facility.