The Poteet energy storage project, identified by EIA Plant Code 67949, is operated and owned by Hen Infrastructure. This facility, located in Poteet, Texas, is set to have a capacity of 9.9 MW and utilizes advanced battery technology for energy storage. The project is situated within the Electric Reliability Council of Texas (ERCOT) power control area and is classified as unregulated under U.S. regulatory standards. The Poteet project is expected to come online in 2025, contributing to the region’s energy infrastructure and supporting the transition to more sustainable energy solutions.