Millington Solar is a photovoltaic solar energy project located in Millington, New Jersey, with a capacity of 5 megawatts. The project is operated and owned by TPE MD KE51, which maintains an unregulated status under U.S. regulatory guidelines. Situated within the PJM Interconnection power control area, Millington Solar harnesses solar energy as its primary fuel source. The project is expected to come online in 2027, contributing to the growing demand for renewable energy solutions in the region.