Lupinus Solar 3 is a photovoltaic solar energy project with a capacity of 100.8 MW, located within the Electric Reliability Council of Texas (ERCOT) power control area. The project is operated and owned by Lupinus Solar 2, which maintains a direct holding in the project. As an unregulated entity, Lupinus Solar 3 is positioned to contribute to the growing demand for renewable energy in the region. The project is expected to come online in 2026, harnessing solar power as its primary fuel source. The geographical coordinates for the project are 33.175462 degrees latitude, indicating its strategic placement for optimal solar energy generation.