Lumina II Solar is a significant energy storage project located in Snyder, Texas, operating under the ERCOT power control area. With a capacity of 160 MW, this unregulated facility is managed by Intersect Power, which also holds ownership of the project. Utilizing advanced battery technology, Lumina II Solar is designed to enhance energy storage capabilities within the region. The project is expected to come online in 2025, contributing to the growing demand for reliable and sustainable energy solutions.