The Kingery Battery Energy Storage System, operated and owned by Hecate Energy, is a significant project within the PJM Interconnection power control area. With a capacity of 425 MW, this unregulated facility utilizes advanced battery technology to provide energy storage solutions. The project is strategically positioned at a latitude of 38.59857, enhancing its operational efficiency and integration into the regional energy grid. While the expected online year is not available, the Kingery Battery Energy Storage System represents a forward-looking investment in energy storage, aligning with the growing demand for reliable and sustainable energy resources.