Hecate Energy is set to develop the Harley Hand Solar project, identified by EIA Plant Code 64234, located in Trent, Texas. This unregulated project, with a capacity of 500 MW, will utilize advanced battery technology for energy storage. The project is expected to come online in 2027 and will operate within the Electric Reliability Council of Texas (ERCOT) power control area. Hecate Energy serves as both the project operator and owner, reinforcing its commitment to innovative energy solutions.