The Harwood Energy Storage Plant, operated by Harwood Power, is a state-of-the-art facility located in King George, Virginia, within the PJM Interconnection power control area. With a project capacity of 100 MW, this battery-based energy storage system is designed to enhance grid reliability and support renewable energy integration. The plant is classified as unregulated under U.S. regulatory status, allowing for flexible operational strategies. Scheduled to come online in 2029, the Harwood Energy Storage Plant represents a significant advancement in energy storage technology, positioning Harwood Power as a key player in the evolving energy landscape.