Greenwood Solar I is a photovoltaic solar energy project located in Culpeper, Virginia, with a capacity of 100 megawatts (MW). Operated by Greenwood Solar I and owned by NextEra Energy Resources, this project is part of the unregulated sector under the jurisdiction of the PJM Interconnection power control area. The project is expected to come online in 2027, harnessing solar energy as its primary fuel source. NextEra Energy serves as the holding company for both the project operator and owner, reflecting a strong commitment to renewable energy development. The geographical coordinates for Greenwood Solar I are 38.42867 degrees latitude.