The Godinho Dairy Digester, identified by EIA Plant Code 68837, is a forthcoming renewable energy project operated by Aligned Digesters Co. Located in Los Banos, California, this facility is set to utilize internal combustion technology to convert biomass waste into energy, with a projected capacity of 2 MW. The project is expected to come online in 2025 and will operate within the California Independent System Operator power control area. Notably, the project is classified as unregulated under U.S. regulatory standards, allowing for operational flexibility. Aligned Digesters Co serves as both the project operator and owner, ensuring a cohesive management structure for the successful implementation and operation of the digester.