This website is under development, but we are pushing out updates as we build, so check back Nov. 1 for our official launch.

The Furay Battery Energy Storage System, operated and owned by Blue Topaz 1, is a significant project within the ERCOT power control area. With a capacity of 304 MW, this unregulated facility utilizes advanced battery technology to provide energy storage solutions. The project is strategically positioned at a latitude of 29.857289 and is expected to come online in 2027. As a key player in the energy sector, the Furay Battery Energy Storage System aims to enhance grid reliability and support the integration of renewable energy sources.

Loading...
Furay Battery Energy Storage System
Battery
Blue Topaz 1
Blue Topaz 1
Unregulated
TRE
ERCOT
CenterPoint Energy Houston Electric
TX
United States
304
304
Announced
null
null