The EnerSmart Imperial Beach Battery project, identified by EIA Plant Code 66551, is a cutting-edge energy storage initiative operated by EnerSmart Storage. Located in San Diego, California, this project is strategically positioned within the California Independent System Operator’s power control area. With a capacity of 6 MW, the facility utilizes advanced battery technology to provide efficient energy storage solutions. As an unregulated project, it is set to come online in 2026, contributing to the region’s energy infrastructure and supporting the transition to renewable energy sources. EnerSmart Storage, both the project owner and operator, is committed to enhancing energy reliability and sustainability in the area.