The EnerSmart El Cajon Battery project, identified by EIA Plant Code 66754, is a significant energy storage initiative operated by EnerSmart Storage. Located in El Cajon, California, this project is positioned within the California Independent System Operator’s power control area. With a capacity of 3 MW, the facility utilizes advanced battery technology to provide energy storage solutions. As an unregulated project, it is expected to come online in 2025, contributing to the region’s energy infrastructure and supporting the transition to renewable energy sources. EnerSmart Storage serves as both the project owner and operator, ensuring a cohesive approach to the management and deployment of this energy storage asset.