Energiza Combined Cycle is a significant energy project located in San Juan, with a projected capacity of 478 megawatts. Operated and owned by New Fortress Energy, this facility utilizes advanced combined cycle technology, primarily powered by natural gas. The project is classified as unregulated under U.S. regulatory standards, allowing for flexible operational strategies. With an expected online year of 2028, Energiza Combined Cycle is poised to contribute to the region’s energy landscape, enhancing reliability and efficiency in power generation. The project’s strategic location at a latitude of 18.4638 positions it favorably for energy distribution within the power control area.