CPV Springs Wind is a wind energy project operated and owned by Competitive Power Ventures, with a planned capacity of 150 MW. The project is situated within the PJM Interconnection power control area and utilizes wind turbine technology as its primary fuel source. As an unregulated entity, CPV Springs Wind is positioned to contribute to the growing demand for renewable energy solutions. The project is expected to come online in 2028, aligning with industry trends towards sustainable energy development. The geographical coordinates for the project are approximately 39.317054 degrees latitude.