Cedar Energy Center, located in Chesapeake, operates under the management of East Point Energy, a subsidiary of Energidepartementet. This facility, with a capacity of 20 MW, utilizes advanced battery technology for energy storage, contributing to the PJM Interconnection power control area. As an unregulated project, Cedar Energy Center is owned by East Point Energy, which is part of the Equinor ASA holding company. The project is positioned to play a significant role in enhancing energy reliability and efficiency within the region. The expected online year for this project is currently not available.