This website is under development, but we are pushing out updates as we build, so check back Nov. 1 for our official launch.

The Cambridge CT Hybrid project, identified by EIA Plant Code 2038, is a cutting-edge energy storage initiative operated by Great River Energy. This unregulated project is strategically located in Cambridge, Minnesota, with geographic coordinates of 45.60034 degrees latitude. The facility is designed to have a capacity of 1.5 megawatts, utilizing advanced battery technology to enhance energy storage capabilities. As part of the Midcontinent Independent System Operator power control area, the project is expected to come online in 2025, positioning Great River Energy as a leader in innovative energy solutions.

Loading...
Cambridge CT Hybrid
Battery
Great River Energy
Great River Energy
Unregulated
MRO
Midcontinent Independent System Operator
Great River Energy
MN
United States
1.5
1.5
Construction Begun
null
null