The Cambridge CT Hybrid project, identified by EIA Plant Code 2038, is a cutting-edge energy storage initiative operated by Great River Energy. This unregulated project is strategically located in Cambridge, Minnesota, with geographic coordinates of 45.60034 degrees latitude. The facility is designed to have a capacity of 1.5 megawatts, utilizing advanced battery technology to enhance energy storage capabilities. As part of the Midcontinent Independent System Operator power control area, the project is expected to come online in 2025, positioning Great River Energy as a leader in innovative energy solutions.