Bellefield 3 Solar and Battery Storage is a significant energy project located in Mojave, California, operating under the EIA Plant Code 67894. Managed by The AES Corporation, this unregulated facility is designed to enhance energy storage capabilities within the California Independent System Operator power control area. With a projected capacity of 150 MW, the project utilizes advanced battery technology to store energy efficiently. Scheduled to come online in 2027, Bellefield 3 aims to contribute to the region’s renewable energy goals and support grid stability through innovative energy storage solutions. The AES Corporation serves as both the project owner and operator, ensuring a cohesive approach to the development and management of this critical infrastructure.