The Bedington Energy Facility, identified by EIA Plant Code 64848, is a photovoltaic power generation project operated by Torch Clean Energy. Located in Martinsburg, West Virginia, the facility is positioned within the PJM Interconnection power control area. With a projected capacity of 100 MW, the facility harnesses solar energy as its primary fuel source. The project is currently classified as unregulated under U.S. regulatory standards and is expected to commence operations in 2026. Torch Clean Energy serves as both the project operator and owner, reflecting a commitment to advancing renewable energy solutions.