Aratina Solar Center 2, identified by EIA Plant Code 64215, is a significant energy project operated by Avantus, a subsidiary of KKR & Co. Located in Boron, California, this facility is set to harness advanced battery technology for energy storage, with a total capacity of 200 MW. The project is positioned within the California Independent System Operator power control area and is expected to come online in 2026. As an unregulated entity, Aratina Solar Center 2 represents a strategic investment in renewable energy infrastructure, aligning with the growing demand for sustainable energy solutions.