Alamo 7 Battery 2, identified by EIA Plant Code 66298, is a significant energy storage project located in Stamford, Texas, within the ERCOT power control area. Operated by Consolidated Edison Development, a subsidiary of RWE Aktiengesellschaft, this facility is designed to have a capacity of 150 MW. The project utilizes advanced battery technology to provide energy storage solutions, contributing to the stability and efficiency of the power grid. As an unregulated project, Alamo 7 is expected to come online in 2025, positioning itself as a key player in the evolving energy landscape.