Maxeon Q3 shipments have dropped to 622MW, with 15% of its global workforce laid off by the end of the year. The company said its Q3 revenue would be in the range of US$224-US$229 million, dropping from US$348.4 million in Q2, representing a 35.7% decrease. Maxeon also announced a plan to “re-engineer” its interdigitated back contact (IBC) manufacturing capacity and begin the preparation of its Fab 3 facility in Malaysia to install a tunnel oxide passivated contact (TOPCon) solar cell pilot line.

Solar Dominates US Energy Capacity Growth
The Federal Energy Regulatory Commission (FERC) has published data showing that solar accounted for over 75% of US electrical generating







