Cranberry Point Energy Storage

Loading...
Cranberry Point Energy Storage
Active
CNR
21/03/2018
30/05/2025
NEISO
Plymouth
MA
Hybrid
Carver 115 kV Primary POI Loop-in station with 3-breaker ring bus interconnecting to line 127 located just south of Carver substation Alternate POI Expand the existing station to add a 4th bay with 2 breakers to interconnect the project.
150