Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.
Project Name:
Aurelius 3 Solar
Project Status:
Active
Submission Date:
45028
In Service Date:
31/03/2029
ISO/Balancing Authority:
ERCOT
County:
Deaf Smith
State:
TX
Company Name:
IP Roman III LLC
Gen Type:
Solar
Point of Interconnection:
23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).