1400 MW HVDC Line into Millstone
Withdrawn
N/A
29/05/2019
45294
NEISO
New London
CT
Hybrid
Point of Interconnection:
The proposed point of Interconnection is the Eversource Millstone 345kV substation in Waterford CT – Alternate is Haddam 345 kV Substation
1400