This website is under development, but we are pushing out updates as we build, so check back Nov. 1 for our official launch.

1200 MW HVDC Line into Singer (Controllable)

1200 MW HVDC Line into Singer (Controllable)
Withdrawn
N/A
29/07/2019
45300
NEISO
Fairfield
CT
Hybrid
The proposed point of interconnection is 345kV Singer substation in Bridgeport CT.
1200