Alliant Energy Corp has chosen Burns & McDonnell to handle the engineering, procurement, and construction of 200 MW of solar projects in Iowa. The projects, which include a 150-MW solar farm in Lee County and a 50-MW Creston project in Union County, will be fully integrated with Burns and McDonnell’s union construction subsidiary AZCO handling the building process. The Wever project, located in a flood plain, required additional planning and engineering solutions to prepare for 500-year flood levels. The solar farms are expected to be operational later this year, with most of the labor coming from local trades.

Solar Dominates US Energy Capacity Growth
The Federal Energy Regulatory Commission (FERC) has published data showing that solar accounted for over 75% of US electrical generating







